New Brand Color AFR logo

“Elite Floor Removal. Tactical Precision. No Compromise

AFR Protocol & Preparation

The 9:00 AM Standard
Your Pre-Arrival Prep Checklist

Ensure a Flawless Start. How to Prepare Your Home for Our Arrival Window.

Your Project is Scheduled

We look forward to serving you. Please review the checklist below before our arrival.

Standard Arrival Window: 9:00 AM – 10:00 AM

Pre-Flooring Removal & Installation

  • The First Morning

    Our AFR team will arrive between 9:00 AM and 10:00 AM. This initial time is used to prep the work van, secure the perimeter, and gather necessary materials for tactical containment.

  • Coordination

    Unless other arrangements were made, please be onsite the first morning to walk the job with us and confirm the exact scope of work to be performed.

  • Daily Schedule

    After the initial walkthrough, your lead AFR specialist will discuss daily start times with you. We strive to accommodate your schedule, whether you prefer earlier or later starts.

Customer Responsibilities

To ensure a safe, efficient, and dust-contained process, please review the requirements based on the service basis you selected: Empty or Occupied.

Option A
Empty Status

The workspace is completely ready for work upon our arrival.

  • Applicable for new construction with no furniture.
  • Or, you have made prior arrangements to have all furniture removed from the workspace entirely.
Most Common
Option B
Occupied Status

Our team will handle moving your large furniture. However, you must prepare the following prior to our arrival:

  • ! Remove all bedding and linens.
  • ! Clear all closet floors completely.
  • ! Clear floors of small loose items (toys, shoes, rugs).
  • ! Clear tables, dressers, and counters of knickknacks and breakables.

Completion & Payment

  • The Final Walk-Through

    Upon completion, we ask that you be present to walk the job with your lead AFR specialist. If there are any issues, please address them at this time so we can resolve them immediately. You will be asked to sign off on the completion and satisfaction of the job.

    Note: Signing off does not mean we won’t acknowledge or help with problems that may arise in the future — we stand by our Gold Standard work.

  • Final Payment Protocol

    We have made the payment process seamless. You do not need to worry about paying on the spot. You will receive an official invoice via email from our office, sent in the exact same format as your original estimate.

Frequently Asked Questions

Ready to Schedule Your
Flooring Removal?

Based in Jacksonville, FL — same-day estimates available.

Advanced Flooring Removal — Gold Standard Flooring Prep.

Real Case Study

The Cost of Cheap Glue: A Rescue Story

We've been in the trenches. See how we fixed a client's "hollow spots" caused by hardware-store adhesives.

Read Insight →
Technical Insight

Bostik GreenForce: The 2-in-1 Secret

Why moisture vapor control is the most critical tactical decision for your engineered wood installation.

Learn the Science →
Homeowner Guide

The 9:00 AM Standard: Prep Checklist

Ensure a flawless start. How to prepare your "Occupied" home for our arrival window.

View Checklist →
AFR Technical Insight

Why Professional Installs Are Harder to Remove

A "dry slab" and high-quality thinset create a bond that is practically permanent. When removing thin tile installed by a professional, the removal becomes a Two-Step Process: first the tile, then the bonded thinset. This generates a significantly higher volume of fine silica dust, which is why our Dust Contained ecosystem is a necessity, not an option.

Discover more from Advanced Flooring Removal

Subscribe now to keep reading and get access to the full archive.

Continue reading